|
Client |
Year |
Location |
Scope of Work |
|
ORC AB |
2010 |
Sweden |
Engineering assistance for
developing a paravane based dispersant for offshore use |
|
Pampas Marina AB |
2009 |
|
Structural design of a
transport pontoon in accordance with classification rules. |
|
Klart Skepp Marinteknik AB |
2009 |
|
Weighing of M/S Petsamo. |
|
JV Niko/Båtservice |
2009/2010 |
Iran |
Pre Engineering for removal
of 8 wrerck in the Persian Gulf |
|
Impac Offshore Engineering
Gmbh/Afcons Infrastructures Ltd, India, Madagascar |
2009 |
Madagascar |
Marine operations engineering
for installation of a pipeline |
|
Holy House Shipping / MS
Cherry |
2009 |
Sweden |
Design of a towing system for
towage of a disabled reefer ship from Panama to EC Canada |
|
AIX / NCC Sweden |
2009 |
Sweden |
Marine engineering services
in connection with pre planning of a floating arena |
|
Impac Offshore Engineering
Gmbh/Afcons Infrastructures Ltd, India |
2008-2009 |
Tamil Nadu, India |
Field Engineer/for
installation of two pipelines at the
South East Coast of India |
|
|
2008 |
|
Engineering for sea fastening
of two el-motors (each 103 T) onboard M/S Falcon, Västerås - |
|
MacroCe Rydin AB |
2008 |
|
Rolling- and inclination-
test of M/S Draga for the Sw. Maritime Adm. |
|
Tranbär Förskola |
2008 |
|
Engineering for mooring of an
accommodation barge (32.5x13x3.5 m). |
|
Saltech Consultants AB |
2008 |
|
Technical Specification for
the modification of HMS Carlskrona into a signal surveillance ship. |
|
Statens Maritima Museer |
2008 |
|
Technical Specifications for a/ Modification of the
el-system onboard lighthouse vessel Finngrundet and b/ General maintenance and
docking of ice breaker S:t Erik |
|
AkerSolutions / Frigg
Cessation Project, Norway |
2008 |
Norway |
Development of methods in
connection with the DP2 jacket inshore marine operations. |
|
Aker Marine Contractors as |
2006 / 2007 |
|
Development of inshore operations
methods in connection with the scrapping the Frigg DP2 jacket |
|
AKER KVAERNER Engineering
Technology / BP |
2006 |
|
FEED Study. Method development for Marine
Transports, Lifting and Offshore Installation Operations on the Skarv/Idun FPSO
Project |
|
Impac Offshore GmbH |
2006 |
West Coast |
Marine operations
superintendent for repair of a damaged pipe line at the West Coast of India |
|
Trimar Sterling Group |
2005 / 2006 |
|
Development of subsear hot tapping
equipment for discharging oil from sunken vessels in Vietnam |
|
Impac Offshore GmbH/Kavala
Oil |
2004 |
|
Provision of Marine Ops
Manager for Engineering/Construction/Installation of a fixed platform (Jacket
type) in Aegan Sea |
|
Impac Offshore GmbH/Kavala
Oil |
2004 |
|
Provision of Marine Ops
Superintendent for installation of a Drill Rig onto a fixed Platform in Agean
Sea, Greece |
|
Trimar Sterling Group Fortnum
Oy |
2004 |
|
Marine system coordinator in connect
a study for a new oil export terminal for S:t Petersburg, Russia |
|
Trimar Sterling Group |
2003 |
|
Assistance in connection with
a large bid for oil pollution control equipment for Vietnam |
|
Röda Bolaget AB |
2003 |
Gothenburgh |
Dredging Project in the Port
of Gothenburg . Technical assistance in connection with bid for marine
services. |
|
Röda Bolaget AB |
2003 |
East Coast of |
Salvage Engineering for
M/S Nordwik |
|
Jumbo |
2003 |
South East coast of Norway |
Independent surveyor in
connection with transport from Norway to West Africa on Heavy Lift Ship M/V
Daniella |
|
Röda Bolaget AB |
2002 |
|
Assistance for oil removal
from M/V Albakor |
|
Master Marine a.s |
2002 |
|
Development of systems on
vessels for removal of offshore platforms. |
|
Impac Offshore gmbh |
2002 |
|
Up front engineering to be
used for the design of the module. Load out and transport of 2400 t compressor
module for the Snövit project |
|
Jumbo |
2002 |
Norrkoeping |
Independent surveyor in
connection with transport from Sweden to US Gulf on Heavy Lift Ship M/V Jumbo
Vision |
|
Röda Bolaget |
2002 |
Gothenburg |
Technical advisor for
removal of two wrecks |
|
Röda Bolaget |
2001 |
Gothenburg |
Construction of mooring
points. Engineering |
|
Swedish Naval Defence |
2001 |
|
Sunken quay for submarines,
Study for removal |
|
Wire'n |
2000 |
|
Calculation of additional
stability data for tug 'Mercur' |
|
Swedish Ship Administration |
2000 |
|
Calculation of Bollard Pull
for estimation of criteria for towage |
|
Pampas |
2000 |
|
Stabilty studies fo pontoon to
be used as living quarter |
|
Pampas Marina |
1999-2001 |
Stockholm, Sweden |
Engineering for conversion of
a pontoon into a pleasure craft |
|
Nordic Wind Power |
1999 |
|
Marine Operations Coordinators
for installation of 34 wind mills offshore Gotland |
|
Röda Bolaget / Insurance Co Skandia |
1999 |
North East Coast of Sweden |
Salvage of M/S Ice Star,
Advisors |
|
Röda Bolaget |
1999 |
West Coast of |
Salvage of M/T Sirius |
|
Röda Bolaget |
1999 |
|
Salvage of M/S Bernati |
|
Royal Swedish Navy |
1999 |
Naval Bases in Muskö/Karlskrona |
Training of Salvage Superintendents |
|
STORA/ENZO |
1998 |
Sweden/Bahia,Brazil |
Working out a proposal for coastal
transport of pulp on barges. Conceptual layout of a push barge system. |
|
ESSO / Kvaerner Oil and Gas
a/s |
1998/1999 |
|
JOTUN Development.
Engineering and coordination of marine activities for Construction, Transportation
and Installation of FPSO. Coordination
of classification activities. |
|
SHELL/IMPAC ag |
1997/1998 |
Kazakstan |
Development of platform
(swamp barge) for shallow water drilling. Engineering and assistance for transport,
assembly and operation of platform. |
|
Boa Barges A/S |
1997 |
|
Development of Specification
for modification of ballast system for barge GOLIAT 10 |
|
Norsk Hydro / Consultas |
1997 |
|
VISUND Development Project,
verification of engineering and operations documents for Topsides Load Out,
Transport and Mating |
|
SAGAS/Coflexip Stena Offshore
Norge A/S |
1997 |
|
VARG Development Project, Engineering
and Operations Management assistance for installation of a sub sea buoy (for
riser support) |
|
Röda Bolaget AB |
1997 |
|
Salvage of M/S SEAWIND,
Technical advisor |
|
Röda Bolaget AB |
1997 |
Swedish West Coast |
Salvage of M/S CORALLE,
Technical assistance |
|
Röda Bolaget AB |
1996 |
Öresund Straits |
Salvage of M/S GRIPSHOLM and
M/S BETTY THERESA, Technical assistance |
|
Röda Bolaget AB |
1995/1996 |
The Baltic |
Development of systems for
transport of pulp wood |
|
Aker Marine a.s. |
1996 |
|
Study for transport and
mating of integrated deck for Tension Leg Platform |
|
Boa Barges a.s |
1996 |
Spain-Sweden |
Method development for transport
of bridge sections (weight each approx 5000 t) |
|
Neptun Heavy Lift A/S / HMDC |
1997 |
|
Load out, Transport and
Mating of the 38,000 t Topsides for the Hibernia Platform |
|
Roeda Bolaget AB |
1996 |
Varberg, Sweden |
Salvage of M/S Koralle |
|
Roeda Bolaget AB |
1996 |
Oeresund Straits |
Salvage of M/S GRIPSHOLM and
M/S BETTY THERESA, Technical assistance |
|
Roeda Bolaget AB |
1995/ 1996 |
The Baltic |
Development of systems for
transport of pulp wood |
|
Aker Marine a.s. |
1996 |
|
Study for transport and
mating of integrated deck for Tension Leg Platform |
|
Boa Barges a.s |
1996 |
Spain-Sweden |
Method development for
transport of bridge sections (weight each approx 5000 t) |
|
Neptun Heavy Lift A/S |
1995/ 1996 ongoing |
New Foundland |
Operations planning and management for load out, transport and mating of the integrated deck for the Hibernia Platform. Operation to be completed in March 1997. |
|
Roeda Bolagat / Swedish Ship
Directorate |
1996 |
Goeta river Sweden |
Method development for
salvage in case of ship grounded in the river. |
|
Roeda Bolaget AB |
1995 |
|
Development of system for
transport and storage of potable water |
|
Kvaerner Moss Technology |
1995 |
|
Engineering for docking of
SS P26 |
|
Roeda Bolaget AB |
1995 |
|
Engineering and operations
assistance for salvage of M/S SEKSTAN |
|
Roeda Bolaget AB |
1995 |
Husum |
Engineering and operations assistance
for salvage of M/S KREVA |
|
KvFrner Concrete
Construction A/S |
1993-95 |
|
Engineering for the MSF
(Main Support Frame) Transport & Mating Management of MSF Transport and mating
Operations Engineering of Cofferdam design |
|
Roeda Bolaget |
1994 |
Karlskrona, Sweden |
Design for conversion of a
barge into a ferry Ro-Ro ramp. |
|
Norwegian Contractors |
1993 |
Vats, |
Load-out, transportation and
mating of 4 Riegel Elements to the Troll Gas GBS. |
|
Norwegian Contractors |
1993 |
Vats, |
Engineering and Operation
assisstance for the load-out, transportation and mating of the integrated
deck to the Draugen GBS. |
|
Norwegian Contractors |
1993 |
|
Operation assistance for the
lift-off, transportation and mating of the integrated deck to the Sleipner 2
GBS. |
|
Costain/Taylor Woodrow |
1992 |
|
Transport and installation
of a large floating dock |
|
Kvaerner Egersund |
1992 |
|
HEIDRUN, module
construction, tender. Development of marine procedures for load-out of a
9,500 MT module |
|
Nynaes Petroleum |
1992 |
|
Bitumen tanks.Study for transport
of large storage tanks from Sweden to Estonia |
|
Bukser og Bjergning A/S |
1992 |
|
Management and engineering
assistance for raising of ship ASTREA |
|
SELMER A/S |
1992 |
|
Salhusbroa. Transport and float-off
of a 4,100 MT caisson |
|
Maersk Olie og Gas |
1991 |
SKJOLD Field |
Lifting of separation
module, approx |
|
Haakans Oy |
1991 |
Finland |
Salvage of tug/barge unit FINNBALTIC,
that had turned upside down, with the crane ship STANISLAV YUDIN, 1600 MT |
|
Roeda Bolaget AB |
1991 |
|
Engineering assistance for
raising of Fishing Vessel from |
|
Dansk Bukser og Bjergning A/S |
1991 |
Hanstholm |
Refloating of barge SIMA 3,
that had sunk at Hanstholm, with the crane ship STANISLAV YUDIN, 1600 MT |
|
Neptun Marine Contracting
A/S |
1990 |
|
Salvage of barge GOLIAT 17
that had sunk at NDdendal, with the crane ship STANISLAV YUDIN,
1600 MT |
|
Kvaerner Egersund |
1990 |
Egersund |
SNORRE TLP, trpt of hull
sections.Engineering re. forces, towage resistance, grillage and seafastening
|
|
Kvaerner Egersund |
1990 |
Egersund |
SLEIPNER, engineering for
trpt of Module M 23 |
|
Kvaerner Rosenberg/ UDDCOMB |
1990 |
|
DRAUGEN, trpt of sections
for deckframe. Five transports. Engineering re. forces grillage and
seafastening |
|
Roeda Bolaget AB |
1989 |
|
Push tug/barge. Outline
specification of push tug/barge combination for costal transport |
|
Colombian Goverment /
Swedish Dev.Bank |
1989 |
|
SAN JOSE, Salvage of cargo.
Development of methods for recovery of cargo from |
|
Socialistic |
1989 |
|
Survey for recovery of cargo
offshore Vietnam |
|
Smedvig |
1989 |
Stavanger, Norway |
Docking of J-U Rig WEST BETA
|
|
Statoil |
1989 |
|
Transport of the 48,700 MT integrated
deck for GULLFAKS C Platform |
|
NYMO Mekaniske Verkstad |
1988 |
|
Module transport. Transportation manual |
|
Rauma Repola / Aker Contracting |
1988 |
|
GULLFAKS C Modules.
Transportation manual |
|
J/V Neptun/Norwegian Contractors
|
1988 |
|
Towage of purpose built
barge DAVID |
|
Bilfinger+Berger |
1988 |
Germany |
Monotower, Development of
marine procedures for assembling of monotower |
|
Byggnadsstyrelsen |
1988 |
|
Transport and docking of the
ancient warship VASA into her new museum |
|
Aarhus Shipsverft |
1988 |
Aarhus - Oslo |
Transport of containercrane |
|
Rauma Repola |
1987 |
M@nthyluoto - Stavanger |
Transport of containercrane |
|
Insurance Co |
1987 |
The Baltic |
Salvage of M/S NORDANHAV |
|
Insurance Co |
1987 |
|
Salvage of the barge SIMA 3 |
|
Swedish Coast Guard |
1987 |
The Baltic |
Salvage of Ro Ro vessel M/S
FEEDERCHIEF |
|
Sv Ind & Marine |
1987 |
Gothenburg - Rauma |
Transport of harbour crane |
|
Aarhus Shipsverft |
1987 |
Bremerhafen - Vallhamn |
Transport of containercrane |
|
Aarhus Shipsverft |
1987 |
|
Transport of containercrane |
|
U.K.-Club/Associated |
1987 |
|
Removal of two tankers, sunk
after an explosion |
|
CEPSA |
1986 |
|
Removal of tankerjetty
(approx 10,000 MT) destroyed after the explosion of two tankers |
|
Aalborg Vaerft |
1986 |
Aalborg |
Load-out of offshore deck-structures
(800 MT), for the ROLF Platform |
|
Aalborg Vaerft |
1986 |
Esbjerg |
Load-out of helideck for
ROLF Platform |
|
Nymo Mekaniska Verkstad |
1986 |
Grimstad |
Load-out of three modules
for EKOFISK Platf |
|
CFEM |
1986 |
Dunkerque |
Lifting of Drill-derrick
onboard SAFE PETROLIA |
|
Skuld Insurance |
1986 |
|
Removal of M/V CAVIMA that
capsized and sunk after a collision |
|
Sea-Rig McGregor |
1986 |
Plymouth/Dartford |
Installation of two Ro Ro
linkspans |
|
Austin+Pickersgill |
1986 |
|
Installation of engine (400
MT) and deckhouse (500 MT) on newbuilding |
|
Smit Tak |
1986 |
Off den Helder |
Savage of M/V OLAF,
capsized/sunk with contaminating cargo onboard (4,000 MT) |
|
Aalborg Vaerft |
1986 |
Aalborg |
Load-out of offshore
deck-structures for DAN Field, A+B each approx 750 MT |
|
Monberg+Thornsen |
1986 |
|
Installations of four
caissons for new ferry-berth (330 MT) |
|
Scott Lithgow |
1986 |
|
Installation of drill-derrick
onto newbuilt semi-sub OCEAN ALLIANCE |
|
Krupp |
1986 |
|
Dismantling of bridge for
conversion,650 MT |
|
HDW |
1986 |
|
Load-out of submarine
sections for completion (450 MT) |
|
Lloyd Werft |
1986 |
|
Various lifting works for
conversion and reengine of M/V QUEEN ELISABETH II |
|
Deutfracht |
1986 |
|
Load-out of transformer,(400
MT) |
|
F S G |
1986 |
|
Installation of lengthing
sections for ferry conversion,(400 MT) |
|
Statoil |
1986 |
|
Transport and mating of the
integrated deck for GULLFAKS A Platform, (42,300 MT) |
|
RGC-Methil |
1986 |
Ardiersier - Methil |
Transport of buoyancy-tanks
for the SHELL TERN Jacket |
|
Norsk Hydro |
1986 |
Avonmouth - Kristiansand |
Transport of cranes for the
OSEBERG A platf. |
|
HDW |
1985 |
Ameland Gas |
Installation of
Wellhead-Fielddeck AWG-1 |
|
Butters |
1985 |
Tyne - |
Load-out, transportation and
load-off of a 450 MT harbour crane |
|
Press Production |
1985 |
|
Load-out of two modules each
430 MT and two helidecks each 150 MT |
|
Hamilton Brothers |
1985 |
Montrose |
Load-out of gas lift package
|
|
Nymo Mekaniske |
1985 |
Grimstad |
Inshore installation of upper
deck section onto quarter module, (250 MT) |
|
Vindholmen Yard |
1985 |
Vindholmen |
Load-out of module, 250 MT
approx |
|
GVA |
1985 |
Gothenburg |
Lift-off of derrick and
drill deck, 250 MT approx |
|
GVA |
1985 |
Gothenburg |
Installation of modules on
Balmoral Floating Prodfuction Platform, (400 MT) |
|
GVA |
1984 |
Gothenburg |
Installation of leg sections
onto Jack-Up |
|
GVA |
1984 |
Gothenburg |
GVA Newbuilding 943. Several
lifts by HEBE 2, equipped with fly-jib |
|
Moss Verft |
1984 |
Moss - Kaarstoe |
Transport of module, 300 MT
approx |
|
Howard Doris |
1984 |
|
Gaslift module. Yardinstallation |
|
Mattson roup/Consafe |
1984 |
Marstrand |
Off-lifting and mating of modules
from SAFE PETROLIA, 700 - 900 MT approx |
|
MRV |
1984 |
Stavanger/Vats |
Transport and mating of the
integrated deck for STATFJORD C Platform, 40,660 MT approx |
|
Elf |
1983 |
|
Lift and installation deck-structure
for NE FRIGG Control Station |
|
|
|
|
Installation and hook-up of
two deck modules |
|
Kvaerner Brug A/S |
1983 |
Egersund and |
Load-out, float-off towage of
control column for NE FRIGG Field |
|
O.M.R. |
1982 |
|
Transport of the base for a
loading buoy |
|
Asea Kabel/Swedish Power
Board |
1982 |
|
Laying of marine power
cable, |
|
Nissho Iwai Corporation |
1982 |
|
Transport of templates for
Hutton Field |
|
Saga Benin |
1982 |
Tananger - Cotonou |
Transport of jackets topside
facilities |
|
CFEM |
1982 |
Dunkerque |
Installation of legs. HEBE 2
equipped with with |
|
Hellenic Shipyard Navarino |
1982 |
|
Uprightning and refloating
of the passenger liner and a floating dock |
|
Polish |
1982 |
Ystad |
Uprighting of the
railway-ferry JAN HEWELIUSZ |
|
Cleveland |
1982 |
|
River Thames flood and
protection barrier installation |
|
Sale'n Protexa |
1981 |
Gothenburg - |
Foat-on, transport and float-off
of a 6,700 MT Jack-Up rig |
|
Sale'n Protexa |
1981 |
Gothenburg - |
Foat-on, transport and
float-off of Jack-Up drilling rig |
|
Swedish Shipping Directorate |
1981 |
The |
Lifting of fully loaded tanker
SEFIR from waterdepth of |
|
MRV |
1981 |
Stavanger - Vats |
Lift and transport of the
integrated deck, (40.660 MT) for STATFJORD C Platform |
|
Mobil Oil |
1981 |
Invergordon - |
Transport of two trusses, (2,400
MT) for the STATFJORD C Deck |
|
MRV |
1981 |
Stavanger - Vats |
Lift and transport of the
integrated deck STATFJORD B Platform, (38,700 MT) |
|
Atlantica |
1980 |
Stord Verft |
Lifting of a floating dock out of water repair. 36,000 MT approx |
|
Bilfinger and Bilfinger |
1980 |
|
Transport of a column, 400
MT, in the main hooks of HEBE 2. Submerging and connection to the base-plate
in |
|
Western Oceanic |
1979 |
|
Docking of Jack-Up rig |
|
SPU |
1979 |
|
Transport of pressure vessels |
|
Goverment of Trinidad and
Tobago |
1979 |
|
Clearing of more than 20
wrecks at the entrance to and in the harbour |
|
West of |
1979 |
Virgin Islands US |
Raising of the passanger
cruiser ANGELICA LAURO in the harbour of St.Thomas |
|
Panama Canal Commission |
1979 |
|
Clearing of the bulk ship
QUIDNET, wich sunk after a collision and interfered the traffic |
|
MRV |
1979 |
Fredrikstad - Egersund - Stavanger |
Transport of two 2,400 MT
trusses for the for STATFJORD B Deck |
|
Suez Canal Authority |
1979 |
|
Towage of floating dock |
|
Aramco Overseas Co |
1978 |
|
Transport of pressure vessels |
|
Aramco Overseas Co |
1978 |
|
Transport of control buildings |
|
Westham Dredging |
1978 |
Arabian Gulf - |
Transport of the dredger
KUNARA |
|
Reggiane SPA |
1978 |
|
Transport of two grain ship
unloaders |
|
British Petroleum Ltd |
1978 |
West Sole Gas Field |
Dismantling and lifting of
topside facilities and jacket on to the transport barge |
|
Translift AG / Mobil Oil |
1978 |
Egersund |
Load-out and Float-off of
single point mooring buoy for STATFJORD A |
|
Aramco |
1978 |
|
Towage of barge GOLIAT 17 |
|
Suez Canal Authority |
1978 |
|
Uprighting of more than 20 wrecks
in connection with the enlargement of the Suez Canal |
|
Suez Canal |
1978 |
|
Uprighting and refloating of
a capzised dredger, 5,000 MT |
|
Penrod Drilling Co |
1978 |
|
Towage of Jack-Up rig PENROD
65 |
|
Swedish Club |
1978 |
|
Towage of M/T SVEALAND,
250,000 tdw |
|
Aramco |
1978 |
Tsu - Damman |
Towage of barge GOLIAT 10 |
|
Aramco |
1978 |
|
Towage of barge GOLIAT 10 |
|
Skanska Cementgjueriet |
1978 |
|
Transport of dredger, barges
and equipment |
|
Aker |
1976 |
Stord Verft |
Provision of barge relate
services in connection with transport and mating of integrated deck to the
concrete structure of the STATFJORD A Platform |
|
GVA |
1976 |
Setenave - Gothenburg |
Towed 21 tank ship sections
from from bowparts to completed super tanker hulls |
|
Krupp GmbH |
1975 |
Cuxhaven - Rotterdam |
Transport and install. of a
gantry crane |
|
Swedish Power Board |
1974 |
|
Laying of entrenchment of
marine power cable KONTISKAN I |
|
Newport News Shipyard |
1974 |
|
Transport of a shipyard
crane |
|
Kone Oy |
1972 |
Hanko - Vegesack |
Transport of a shipyard
crane |
|
Kone Oy |
1972 |
Hanko - Malm` |
Transport of one shipyard
crane and two harbour cranes |